Why is the hot runner reviewed together with the mould design?
Runner geometry, gate position, cooling, cavity layout, product appearance and service access affect one another. Reviewing them as one system reduces late design conflicts.
Can Hengqi integrate a customer-specified hot runner brand?
Yes. The project can be engineered around the agreed hot runner standard when the buyer's plant has a preferred brand or maintenance requirement.
How is cavity-to-cavity balance checked?
The trial plan can compare filling sequence, part weight, appearance, dimensions, temperature behaviour and process stability across cavities under the agreed production condition.
What hot runner details should be shared for quotation?
Useful inputs include cavity count, resin, part weight, gate appearance limits, label area, machine injection performance, preferred runner brand, maintenance standard and required production output.
Why does valve-gate control matter for packaging parts?
Valve-gate timing can influence filling sequence, gate mark quality, pressure balance and repeatability, which is important for visible IML containers, thin-wall lids and multi-cavity packaging moulds.